
CalEthos is pioneering a cleaner digital future by developing large-scale, clean energy-powered data center campuses in the Southern California desert. Leveraging abundant solar and geothermal power, coupled with access to national fiber networks, CalEthos aims to serve the growing AI, Cloud, and hyperscale computing needs. The company's strategic location in Lithium Valley provides access to significant geothermal and solar resources, as well as proximity to major network hubs, offering low-latency connectivity. CalEthos focuses on efficient water management and utilizes closed-loop cooling systems. Their development specifications include 315 acres, with approved data center sites, build-to-suit options, and substantial substation power (500MW per site) with diverse 230kV connections.

CalEthos is pioneering a cleaner digital future by developing large-scale, clean energy-powered data center campuses in the Southern California desert. Leveraging abundant solar and geothermal power, coupled with access to national fiber networks, CalEthos aims to serve the growing AI, Cloud, and hyperscale computing needs. The company's strategic location in Lithium Valley provides access to significant geothermal and solar resources, as well as proximity to major network hubs, offering low-latency connectivity. CalEthos focuses on efficient water management and utilizes closed-loop cooling systems. Their development specifications include 315 acres, with approved data center sites, build-to-suit options, and substantial substation power (500MW per site) with diverse 230kV connections.
Business: Develops large-scale clean energy–powered data center campuses (geothermal + solar) under TerraVolt Infrastructure
Location: Headquartered in Tustin, California; development in Southern California desert (Lithium Valley)
Scale: Planned campus footprints ~300–315 acres with site-level power capacity cited (500MW per site)
Technical focus: Closed-loop cooling, efficient water management, low-latency connectivity via national fiber networks
Funding (publicly listed): Small disclosed total funding amount present in evidence (USD 100,000) with last funding date 2024-06-26
Sustainable hyperscale/cloud data center development addressing high energy demand and water/thermal management challenges.
2018
Data center development / clean energy infrastructure
100000.00